Why do I do this to myself?

Well, the playhouse was just practice. Now I get to try the real thing! The goal is to effectively double the size of the house by adding 1280 sq ft of additional living space, as well as an oversized 2-car garage.

The contractor will demolish the old structure, excavate and set the foundation, and erect the shell with all the exterior doors and windows and the siding installed. Then I take over and get to do the electrical, plumbing, heating, drywall, painting, etc., etc...... The first part was scheduled to take a little over a week, since we were using preassembled wall segments that would reduce framing to about 1-1/2 days. Based on the progress I made on the playhouse I figure the second part will take about three years. :-(

Here are the plans for remodeling my house. Since these drawings were scanned we swapped bedroom 4 with the bathroom to put the bathroom plumbing directly over the washer/dryer in the utility area.

floor plan, foundation plan, elevation. PDF file.

The process starts here, with the day they show up with equipment and start to work on the house. Take the full tour by following the links, or go directly to the last set of pictures.

On each page you can click on the pictures to see full-size versions.


Direct links
Day 1 (Thurs., 5/7/98)
Day 2 (Fri., 5/9)
Day 5 (Mon., 5/11) The backhoe arrives
Day 6 (Tues., 5/12) Hauling off debris
Day 7 (Wed., 5/13) Clean up in the rain
Day 8 (Thurs., 5/14) drizzle,showers,rain
Day 9 (Fri., 5/15) Heat at last
Day 13 (Tues., 5/19) The sun finally comes out
Day 14 (Wed., 5/20) The rain returns
Day 15 (Thurs., 5/21) More rain...
Day 16 (Fri., 5/22) Soap suds
Day 18 (Sun., 5/24)
Day 19 (Mon., 5/25)
Day 20 (Tues., 5/26)
Day 21 (Wed., 5/27)
Day 22 (Thurs., 5/28) Forms formed
Day 23 (Fri., 5/28) Concrete at last
Day 27 (Tues., 6/2) A foundation
Day 28 (Wed., 6/3) Building a floor
Day 29 (Thurs., 6/4)
Day 30 (Fri., 6/5)
Day 34 (Tues., 6/9)
Day 35 (Wed., 6/10)
Day 37 (Fri., 6/12)
Day 38 (Sat., 6/13)
Day 43 (Thurs., 6/18)
Day 44 (Fri., 6/19) redoing the roof
Day 45 (Sat., 6/20) weekend work
Day 49 (Wed., 6/24) more rain
Day 51 (Fri., 6/26) damn inspectors
Day 81 (Sun., 7/26) getting there...


Most recent pictures (updated 7/29/98)